Use this guide to assign a unit to a prospect when they express interest in a specific unit, and to remove or change the unit assignment if their interest changes. This ensures accurate tracking throughout the leasing process.
When to Use This
- A prospect selects a specific unit they are interested in
- A prospect changes unit preference
- A unit is no longer available or was assigned in error
- Before sending an application or converting to an applicant
Before You Start
Make sure:
- A Prospect record exists
- The unit is available or approved for assignment
- Prospect information is accurate
Permissions Required: Leasing Agent or higher
How to Assign a Unit to a Prospect
1. Open the Prospect Record
- Navigate to Leasing / Prospects
- Open the correct prospect
2. Assign a Unit
- Locate the Unit Shown/Held tab
- Click New Held Unit
- Choose the appropriate Property, Building, and Unit (if applicable)
- Choose the Held Thru date
Best Practice: Confirm availability before assigning to avoid conflicts.
3. Save the Assignment
- Save the prospect record
- The unit is now linked to the prospect and visible on their record.
What Success Looks Like
- Assigned unit appears on the prospect profile
- Unit selection matches the prospect’s preference
- Assignment date is accurate
- The prospect appears on the A110 Report and Under Units Held
- The Prospect appears on Units and Leases under the Held Property or Unit
How to Remove or Change a Unit Assignment
1. Open the Prospect Record
- Navigate to Leasing / Prospects
- Open the prospect
2. Remove the Unit Assignment
- Locate the Assigned Unit field or section
- Select Delete Held Unit
- The system will ask if you are sure. Click Yes to confirm
3. Assign a New Unit (optional)
- If changing units, select a new unit following the assignment steps above
- Save the record
The prospect record updates immediately.
What Success Looks Like
- Old unit assignment is cleared
- New unit (if selected) displays correctly
- Prospect record reflects current interest
Common Mistakes to Avoid
- Assigning unavailable units
- Forgetting to save after changes
- Leaving outdated unit assignments
- Assigning a unit too early before interest is confirmed
Tips for Efficiency
- Update unit assignments as soon as interest changes
- Document changes using an Activity
- Review unit assignment before sending applications
- Confirm availability with availability reports if needed
Next Recommended Actions
- Enter a New Activity documenting the discussion
- Send an Online Application
- Screen the Applicant through RIQ once submitted